[ Blog ]

Step 7: Floor covering

So, in this episode, our intrepid studio builder wants to cover his floor in something comfy.

Considerations including:

  • Having made a wonderful wooden drum out of his floor we now need to deaden it.
  • Having a low ceiling there’s a chance the room will make a nice comb filter floor to ceiling, so I need to deaden that too.

The logical choice therefore was carpet to stop reflections in the room with a sound stopping underlay to deaden the floor itself acting as a drum.

I chose to use a commercial grade rubber backed carpet (like you get in shops) on top of a product intended as a wood / laminate underlay, and I’m bloody glad I did.

To be precise, the underlay was part code A300 from customaudiodesigns.co.uk

The combination has worked a charm, there’s virtually no resonance from the wooden floor at all.

So what about the process of putting it down.

Step one was rolling out the underlay:

2013-12-08 14.52.46

Arriba Arriba…

underlay, underlay

…Underlay, Underlay

 

 

 

 

 

 

 

MAKE SURE you sweep up thoroughly before you start this, bits of grit can perforate the foil. This is more of an issue for laminate floor which doesn’t like damp coming up from below.

As you can see, I rolled the 2 intact stripes, foil side down along each side and then did the mucking about with the bits that needed cutting in the middle. The idea was to lap up the walls and hide this seam behind the skirting.

I used spray carpet adhesive to glue the foil to the floor and stop it moving. Once I’d cut the middle strips of underlay to size and laid them out I then used foil tape to attach it all together. This also worked well and was easy enough to do.

I was pretty damn chuffed with the finish of this layer, so proud in fact that I totally neglected to take a photo. What a twat.

What I also lack photos of are the next steps, putting carpet down is fairly clear, it came in a roll, I rolled it out and used more spray adhesive to fix it to the underlay. I paid special attention to where my office chair was going to go as the wheels on those tend to ruck carpet up.

 

 

 Read    Comments Closed

More Posts

Step 6: Paint all the things and second fix

Not much to comment on here other than it’s better to paint the walls and ceiling before putting the final floor covering down. Common sense really. I painted the walls and ceiling with the same very slightly off white colour. Here be pictures of painted walls.   Second fix electrics went without  a hitch. At the last […]

 Read    Comments Closed

Step 5: Plasterboard and sweet pink plastery goodness

Not much to report here. After the last post I also added res bar to the ceiling. The biggest concern going is DO NOT SCREW THROUGH THE PLASTERBOARD INTO THE BATTENS. If you do, you will add an acoustic brige and that res bar is suddenly useless (not to mention expensive and complicated). To expand: […]

 Read    Comments Closed

Step 4: First fix wiring and preparing for the plasterboard

Wiring and Earth I wired my studio to allow for 2 ring mains and some lighting and fans. All the wires lead back to the corner of the room where the SWA (armoured) cable and the cat5e comes in from the house. The lighting, fans and one ring used the earth that came from the […]

 Read    Comments Closed

Step 3: Walls and Roof

Buildings are created in layers (just like onions, trolls and parfait – whatever the hell that is). The first layer you make is the frame that holds the rest of the building up. I went for ‘Standard construction’ which means that the structure is effectively a big ‘ole pile of concrete bricks. Walls The structural […]

 Read    Comments Closed

“We interrupt this building work for a live recording…”

Ok, so this wasn’t actually all that recent, but it did happen when I was roughly at the stages of building that I am currently describing. The Result: Before we get any further these are the results: Who, Where and Why: Colin Hartley, a mate of mine who runs a local Open Mic night and […]

 Read    Comments Closed

Step 2 dig a hole, fill it with concrete

There are a whole bunch of possible ways when it comes to building a foundation. Most of them start with digging a trench and filling it with concrete. If your building needs to comply with building regulations you’re best off agreeing the depth with them. They will take into account things like tree roots, types […]

 Read    Comments Closed

Step 1 Getting permission

No matter what country you are in there will be laws about what you can build and where. Because I am building this in the UK on part of the same plot as an existing house I can use certain building rights called permitted development. Please note that this post is just my take on […]

 Read    Comments Closed

A Bit About this Project

I’m writing this blog to document my attempt to build a music studio from nothing. I think it’s fair to say that “we learn more from mistakes than success” can be considered an axiom. What is often missed is that it is especially helpful if those mistakes are other peoples’. It is my intent to be […]

 Read    Comments Closed